| The requirements of the new EMC Directive 2004/108/EC for 'fixed installations' |
¾ hr |
| The requirements of the new EMC Directive 2004/108/EC for custom equipment |
¾ hr |
| Overview of good EMC engineering practices in electrical assembly and wiring |
1½ hrs |
| Overview of good EMC engineering practices for systems and installations |
1½ hrs |
| Overview of good EMC engineering practices in system design |
½ hr |
| Overview of the EMC issues for systems and installations |
1 hr |
| Good EMC engineering practices for systems and installations (1 day version also available) |
2 days |
| Good EMC engineering practices for installations |
3½ hrs |
| Good EMC engineering practices in the design and assembly of industrial cabinets |
3½ hrs |
| Good EMC engineering practices in building installations — for architects |
3½ hrs |
| CE + CE does not = CE ! — What to do instead |
1 hr |
| Cabling and earthing in systems and installations |
1½ hrs |
| The benefits of applying IEC 61000-5-2 for cable screen bonding and earthing |
¾ hr |
| Assessing electromagnetic environments and specifying EM performance |
¾ hr |
| Assessing an electromagnetic environment |
1 hr |
| Earth? What earth? |
½ hr |
| Traditional techniques compromise EMC and worsen reliability |
1 hr |
| Bonding cable screens at both ends |
¾ hr |
| Good EMC engineering practices for installing small domestic or commercial systems |
1 hr |
| Harmonics and power factor correction in electrical power distribution networks |
1 hr |
Pro-Audio: Audio-frequency shield current induced noise is negligible
(as long as it does not flow in the 0V system) |
¾ hr |
| Pro-Audio: Interference-free pro-audio systems |
¾ hr |
| The ‘RSS spreadsheet’ approach to EMC compliance for systems integrators |
1 hr |
| The physical basis of EMC (1½ and 2 hour versions also available) |
2½ hrs |
Electromagnetic phenomena – where they come from and what they can affect and why
(covers 10 phenomena, from 50Hz magnetic fields to GHz radiation) |
1 day |
| Designing and testing for product safety using EN 61010-1:2001 |
1 day |
| Designing and testing for product safety using EN 60950 |
1 day |
| Designing and testing for product safety and LVD compliance |
1 day |
| Designing and testing for EMC for Functional Safety (½ day and 2-day versions also available) |
1 day |